Projects

Pantograph has successfully navigated diverse project challenges and delivered solutions across demanding project environments, continuously strengthening our capabilities through every experience. We remain committed to learning, advancing our expertise, and contributing to the continued advancement of the industry.

S.N Project / Location Client / Contractor Scope of Work Status Year
1 Reem Investment Head Quarter Building M/s. AYAZ Electrical & Mechanical Contracting Chilled Water System Completed 2008
2 Emirates National Investment Co. Building, Al Raka Site M/s. Al Jadeed Engineering Contracting Chilled Water System Completed 2009
3 Commercial Building for Al Freya M/s. Square Gen Contracting Chilled Water System Completed 2009
4 STCC Building M/s. Asian Emirates Electromechanical Chilled Water + Storm Water Reservoir Room Completed 2010
5 Link Project – Saadiyat Island M/s. Asian Emirates Electromechanical Chilled Water System Completed 2010
6 Dull Man Hotel Tower M/s. MAC AIR Ducting Works Completed 2010
7 Building-C-69 M/s. Square Gen Contracting Chilled Water System Completed 2010
8 Commercial Building, ME-10 Plot 78, MBZ City M/s. AL MUMMAYYAZ Chilled Water System Completed 2010
9 Tropical Villa 2 M/s. NASCON Chilled Water System Completed 2010
10 Al Ahamha Villa 22 M/s. TECHNO POWER Chilled Water System Completed 2010
11 Crystal Hotel, TCA, AUH M/s. ZOOM EMIRATES Chilled Water System Completed 2010
12 Commercial Building Shabia M/s. Al Lora Central AC Works AC Commissioning Works Completed 2010
13 Sweihan Military Camp M/s. Ahmed Mohamed Sohail Gen. Contracting Chilled Water Works Completed 2010
14 CMW, Sweihan M/s. Special Group for Investment and Business Consultancy HVAC Insulation and Commission Works Completed 2010
15 Mr. Faraj Bin Hamoudah Villa, Abu Dhabi M/s. Al Asem Electromechanical Contracting Chilled Water System Completed 2010
16 Alain Mall M/s. Three Pyramids Manpower Supply – Chilled Water System Completed 2010
17 ADNOC Business Center Project Package-3 M/s. Ghantot TPT & Gen. Cont. LLC Chilled Water System Completed 2010
18 Paramount Hotel M/s. NASCON Hot Water Supply System Completed 2010
19 Al Daemaki M/s. Zoom Emirates Electromechanical Works LLC Chilled Water System Completed 2010
20 Ministry of Finance Building, Abu Dhabi M/s. MAC AIR Chilled Water System Completed 2011
21 Fish World, Abu Dhabi M/s. MAPCO Plumbing and Fire Fighting System Completed 2011
22 Abu Dhabi Future School Program – KC M/s. First Electro Mechanical Contracting LLC Chilled Water System Completed 2011
23 Jebel Ali Airport M/s. ALEMCO Chilled Water Skilled Worker Supply Completed 2011
24 Dubai Aviation Engineering Project M/s. ALEMCO Chilled Water Skilled Worker Supply Completed 2011
25 Accommodation Building for Police Staff, Khalifa A M/s. EYE KARM General Contracting Chilled Water Works Completed 2011
26 Commercial Building of Shabeb Mohamed Hilal Al Dhaheri M/s. KORE CHINE Building Contracting Chilled Water Works Completed 2011
27 Golf Club House, Dubai Hills M/s. Laodicea Heating Solutions Trading FZE Heater and Solar Panel Works Completed 2011
28 Madonna Spa, Abu Dhabi M/s. Madonna Group Chilled Water Works Completed 2011
29 OMDA Exchange, Khalifa Street M/s. OMDA Exchange Chilled Water Works Completed 2011
30 ADNIC Building, Abu Dhabi M/s. ADNIC Chilled Water Works Completed 2011
31 Commercial Building, MBZ City M/s. ERS Group Electrical Works for MMC Panel Completed 2011
32 Sikka 23, Plot 06, MBZ City M/s. Power LLC Chilled Water System Completed 2011
33 Commercial Building for Suhail Musallam & Saeed Musallam Al Khaili M/s. Asian Emirates Electromechanical Fire Fighting System Completed 2011
34 New Sanya SDB Industrial, Al Ain M/s. Tornado Enterprises HVAC Maintenance Works Completed 2012
35 Al Asayel Equine Swimming Pool M/s. Tornado Enterprises HVAC Ducting Completed 2012
36 Main Office Khalidiyah M/s. Tornado Enterprises HVAC Maintenance Works Completed 2012
37 Abu Dhabi University / SAS Al Anakhl M/s. SAS AL ANAKHL AC Ducting Works Completed 2012
38 GHQ Armed Force, Sweihan M/s. CODE Contracting LLC Chilled Water + Fire Fighting System Completed 2012
39 Al Mabar M/s. Al Mabar HVAC Maintenance Works Completed 2012
40 Khalifa Hospital M/s. Shahana Shahin General Maintenance Chilled Water System Completed 2012
41 Commercial Building M/s. ECOSERV Chilled Water System Completed 2012
42 Maktoom Villa / Sea Palace / D Compound / B Complex / Khalifa Committee Building M/s. SANA AIR MEP Maintenance Works Completed 2012
43 Zumeira Village M/s. Tiger International General Contracting Chilled Water Works Completed 2012
44 Sheikh Khalifa Hospital M/s. Hamilton Internationals Chilled Water Skilled Worker Supply Completed 2012
45 Building C200+C199 M/s. Asian Emirates Electromechanical Chilled Water System Completed 2012
46 DMW-149 M/s. Square Engineering Construction LLC Chilled Water System Works Completed 2012
47 3B+G+19T Building, Jumeirah Village, Dubai M/s. Tiger International General Contracting Chilled Water System Completed 2012
48 STC Building M/s. ORASCOM Construction Chilled Water + Fire Fighting System Completed 2013
49 CMW 10009-C0004 M/s. Trust Construction Est. Fire Fighting System Completed 2013
50 Café de la Piax M/s. MAPCO All MEP Works Completed 2013
51 Grand Flamingo Hotel M/s. Square Gen Contracting Chilled Water System Completed 2013
52 Private Villa M/s. Daphne General Maintenance FCU Installation Completed 2013
53 Mafraq Hospital M/s. Al Atta General Contracting Man Power Supply Completed 2013
54 HQ Villa A&B M/s. MUBADALA HVAC System Completed 2013
55 CMW M/s. Asian Emirates Electromechanical Plumbing Works Completed 2013
56 Airport EXPO in JBB M/s. SPARK HVAC Duct Works Completed 2013
57 Al Rahba Hospital M/s. Tornado Enterprises HVAC Maintenance Works Completed 2013
58 Sea Palace M/s. SANA AIR Chilled Water System Completed 2014
59 Mahawi M/s. Al Naseem Surveillance Apparatuses Chilled Water + Fire Fighting System Completed 2015
60 Aabar Tower M/s. ECOTHERM Chilled Water System Completed 2015
61 RBW4-12, Al Raha M/s. Gulf Sail Specialised Engineering Chilled Water System Completed 2016
62 Saadiyat Island M/s. Al Khaneze Electromechanical Works GI Duct System for HVAC Completed 2016
63 KIZAD, Khalifa Port M/s. Al Khaneze Electromechanical Works Chilled Water System Completed 2016
64 New Commercial Warehouse, Musaffah M/s. NASCON Engineering Fire Fighting + Chilled Water System Completed 2016
65 Rove Hotel Dubai M/s. NASCON Fire Fighting + Chilled Water System Completed 2016
66 Rove Hotel Dubai M/s. NASCON Copper Pipe & Fittings for Solar System Completed 2016
67 Rove Hotel Dubai M/s. NASCON Generator Exhaust Piping Completed 2016
68 Marina Mall M/s. AE Arma Electropac Chilled Water Works Completed 2016
69 Abu Dhabi University M/s. Al Batec Chilled Water Supply (Underground) Completed 2016
70 Abu Dhabi University M/s. Siemens LLC Pipe Fabrication Works Completed 2016
71 Mudon Villas M/s. NASCON Chilled Water Works Completed 2016
72 Falcon Zinc Metal Industries LLC M/s. NASCON Manpower Supply for Chilled Water System Completed 2016
73 Gate Tower / ARC Tower / Sky Tower / Sun Tower M/s. Khidmah Maintenance Works Completed 2017
74 Dog Section K9, Abu Dhabi M/s. Mechano Technical Services Chilled Water Completed 2017
75 Dubai Harbour Car Park M/s. NASCON Chilled Water + Fire Fighting System Completed 2017
76 RBW-14 Al Seef M/s. Al Suweidi Al Shams Chilled Water System Completed 2017
77 Sky Grand Tower M/s. Gulf Sail Specialised Engineering Chilled Water + Fire Fighting System Completed 2017
78 Military College, MBZ M/s. Arco Firefighting Completed 2017
79 Repton M/s. Onyx Electromechanical Contracting HVAC Works Completed 2017
80 Abu Dhabi University M/s. Fortune Properties LLC Chilled Water System Completed 2017
81 RBW4-12 Retired Military Personnel Association Building M/s. Gulf Sail Chilled Water System Completed 2017
82 Warehouses, Offices & Showroom, M22, ADVOC M/s. NASCON Fire Fighting System Completed 2017
83 Majestine Hotel, Dubai NEW M/s. NASCON Engineering Hot Water Riser Pipes & Fittings Completed 2017
84 Abu Dhabi University No. 1, L Shape Building J-196-A M/s. ALBA-TECH Const. & Development LLC Chilled Water System Completed 2018
85 ADIB M/s. Arabian Company Socialized Elec. & Mech. Works LLC Firefighting Completed 2018
86 ADCO PNP M/s. Siemens LLC Firefighting + Pipe Fabrication Works Completed 2018
87 Al Manhal Building, Abu Dhabi M/s. BEMCO Chilled Water System Completed 2018
88 IGG Building M/s. City Compass Chilled Water System Completed 2018
89 Mediclinic Hospital – Basement 2 Piping & Mechanical Works M/s. Advanced National Contracting LLC Chilled Water System Completed 2019
90 Mediclinic Hospital Project M/s. Advanced National Contracting LLC Generator Exhaust System Completed 2019
91 Shams Twin Tower M/s. Al Khaneze Electromechanical Works GI Duct System for HVAC Completed 2019
92 Paramount Hotel M/s. NASCON Engineering Chilled Water + Hot Water System Completed 2019
93 Al Arabia Press & Media Building M/s. Galaxy Advanced General Contracting Co. LLC Man Power Supply Completed 2019
94 Hamdan Tower M/s. Mechano Technical Services Est. Man Power Supply Completed 2019
95 Amity International School Phase II, Al Bahya M/s. BEMCO Firefighting System Completed 2019
96 Amity International School Phase II, Al Bahya M/s. BEMCO Chilled Water System Completed 2019
97 Shop FN-8, Marina Mall M/s. BEMCO Chilled Water System Completed 2019
98 Al Raha Project, Abu Dhabi M/s. ALBA-TECH Const. & Development LLC Man Power Supply Completed 2019
99 The Club Est. M/s. British Club Abu Dhabi HVAC Maintenance Works Completed 2019
100 Mediclinic Hospital, Abu Dhabi M/s. Advanced National Contracting LLC Chilled Water System Completed 2019
101 Mediclinic Hospital Project M/s. SPML RIC Joint Venture Chilled Water System Completed 2019
102 Residential Building SHAMS, RS1, Plot C2, Reem Island M/s. U Energy Central Gas Contracting LLC Natural Gas System Completed 2019
103 Zone RA Staff Accommodation, Yas Island M/s. U Energy Central Gas Contracting LLC Natural Gas System Completed 2019
104 Building No. 54, 60 & 62, Khalifa City M/s. U Energy Central Gas Contracting LLC Natural Gas System Completed 2019
105 Building for Sheikh Rashid Bin Humaid Al Nuaimi, Al Raha M/s. U Energy Central Gas Contracting LLC Natural Gas System Completed 2019
106 Saadiyat Beach Apartments, Saadiyat Island M/s. U Energy Central Gas Contracting LLC Natural Gas System Completed 2019
107 Three Bridges Phase 1, Reem Island M/s. U Energy Central Gas Contracting LLC Natural Gas System Completed 2019
108 Tauqeef M/s. Arabian Company Socialized Elec. & Mech. Works LLC Firefighting Completed 2019
109 M Tower – GJ1321 NEW M/s. Galaxy Advanced General Contracting Chilled Water Insulation Works Completed 2019
110 Residential & Commercial Building, Plot C-2, Sector SDW-4 NEW M/s. U Energy Central Gas Contracting LLC Carbon Steel Gas Piping, Supports, Valves, Welding & Testing Completed 2019
111 Saadiyat Island – Buildings 201–205 NEW M/s. U Energy Central Gas Contracting LLC Roof Gas Piping, Supports, Welding, Pressure Testing & Solenoid Valve Assembly Completed 2019
112 Vida Hotel, Dubai Creek Harbour – Generator Exhaust & Fuel Tank Works NEW M/s. NASCON Engineering Generator Exhaust Piping with Insulation & Fuel Tank Piping Completed 2019
113 Rapid Intervention Buildings, Khalifa City M/s. Mechanical Works & Air Conditioning Services Co. LLC Chilled Water System Completed 2020
114 Al Thanaya M/s. Shapoorji Pallonji Middleast LLC Man Power Supply Completed 2020
115 Al Qana, Abu Dhabi M/s. U Energy Central Gas Contracting LLC Natural Gas System Completed 2020
116 Residential Building RBW & C31, Al Raha M/s. U Energy Central Gas Contracting LLC Natural Gas System Completed 2020
117 P#059 Health Care City, Al Reem Island M/s. U Energy Central Gas Contracting LLC Natural Gas System Completed 2020
118 Najmat Tower, Al Reem Island M/s. U Energy Central Gas Contracting LLC Natural Gas System Completed 2020
119 Lulu Hypermarket, Khalifa City M/s. EMAC Electromechanical LLC Chilled Water System Completed 2020
120 Danat Tower, Abu Dhabi M/s. Galaxy Advance Gen. Cont. LLC Chilled Water System + PI Ducting Completed 2020
121 Al Raha Beach – GJ1257 NEW M/s. Galaxy Advanced General Contracting Chilled Water System Works Completed 2020
122 RBW4 C21 – P#071, Al Raha NEW M/s. U Energy Central Gas Contracting LLC Carbon Steel Gas Piping, Supports, Painting, Solenoid Valve Assembly, Welding & Testing Completed 2020
123 Japanese Garden Extension #3, Abu Dhabi M/s. Syrino Electromechanical Chilled Water System Ongoing 2021
124 Waste Water Monitoring Laboratory, Mafraq M/s. Be Quick Electrical Contracting LLC Chilled Water System Ongoing 2021
125 403 – Sweidi & Shams Building, Abu Dhabi NEW M/s. Shield Gas System Black Steel & Copper Gas Piping, Supports, Welding, Testing & Meter Connection Completed 2021
126 Al Ahd Commercial Building – Project 433-A NEW M/s. Shield Gas System Gas Meter Connection, Kitchen Piping & Welding Completed 2021
127 Al Hur Contracting – Project 470 NEW M/s. Shield Gas System Gas Pipe Installation, Supports, Welding, Testing, Meter Connection & Tank Riser Completed 2021
128 Building Art – Project 453 NEW M/s. Shield Gas System LPG / Gas Piping, Roof Tank Line, Supports, Welding, Testing & Meter Connection Completed 2021
129 DIMC Al Mafraq Factory – Project P-450 NEW M/s. Shield Gas System LPG Piping, Supports, PRDP Assemblies, Filling Point, Testing & Tank Connection Completed 2021
130 Kingston 21 – Jamaican Restaurant – P480 NEW M/s. Shield Gas System Gas Riser, PRDP / Gas Meter Assembly, Kitchen Piping, Testing & Connection Completed 2021
131 P094 Staff Accommodation – Towers A2, B2 & B3 NEW M/s. U Energy Central Gas Contracting LLC Black Steel Gas Pipe Installation, Supports, Solenoid Valves, Fittings & Pressure Testing Completed 2021
132 Saadiyat Island – Imkan Villa NEW M/s. Shield Gas System Black Steel / Copper Gas Piping, Supports, Welding, Testing, Meter Connection & Firefighting Completed 2021
133 Series Cafeteria – Abu Dhabi – P478 NEW M/s. Shield Gas System Gas Riser, Branch Piping, PRDP Assembly, Kitchen Piping, Testing & Connection Completed 2021
134 Abu Dhabi University M/s. Fortune Properties LLC Chilled Water System Completed 2022
135 Commercial Building Sector RBW 6, Plot No. 14, Al Raha Beach M/s. Shield Gas System Natural Gas System Completed 2022
136 Al Raha Beach Residential Building, Plot No. RBW-C5 (504) M/s. Galaxy Advance Gen. Cont. LLC Chilled Water System Completed 2022
137 Petroleum Institute, Khalifa University M/s. Durable Works Gen. Maint. Co. LLC Chilled Water System + Cladding Completed 2022
138 Al Zebaq Property Airport Road Building NEW M/s. Syrino Electrical Contracting Chilled Water System – Installation, Testing, Commissioning & Handing Over Completed 2022
139 Sheikh Tahnoon Medical City EM Project, Al Ain Al Reem Hospico Co. LLC Chilled Water Piping, FAHU, Pump, Valve Package, Flushing & Testing Completed* 2024
140 Alain Hospital Global Electromechanical Cont. & Maint. Est. Flushing of Chilled Water Pipe Network Completed* 2024
141 MBZ City Plaza – Community & Commercial Center Telal Engineering & Contracting LLC / Mawarid Al Sharq AC Copper Pipe Installation, Insulation, Testing & Commissioning Completed* 2024
142 Sheikha Fatima Bint Mubarak Park Morganti Maintenance & Facilities Management Services Water Supply & Drain Provision for Water Purifier Completed* 2024
143 Binghatti Tulip NEW M/s. Granada Europe Engineering Construction LLC Installation & Testing of Chilled Water System Completed 2024
144 Tawam Hospital, Al Ain El Race Cons. & Gen. Cont. Co. LLC Refurbishment Works for Chilled Water Pump Room Completed* 2025
145 Tawam Hospital, Al Ain Al Reem Hospico Co. LLC Supply & Installation of Chilled Water Piping for AHUs Completed* 2025
146 Workshop – Al Ain Medical City Project Liwa Contracting & General Maintenance LLC Chilled Water Piping Installation & Pressure Testing Completed* 2025
147 Midtown Zone 6, Tower A, Meydan 1st, Dubai Eurotech Gas Services LLC Gas Steel Droppers, Risers, Testing, Painting, Supports & Labelling Ongoing / Recent 2025
148 Tawam Hospital, Al Ain El Race Cons. & Gen. Cont. Co. LLC Chilled Water Pump Installation, Pump Base & Temporary Pump Connection Completed* 2026
149 Tawam & Al Wagan Hospital, Al Ain Etihad International Hospitality Firefighting Bypass Pipeline – Supply, Installation, Testing & Commissioning Ongoing / Recent 2026
150 Old Al Ain Hospital – Home Care Project Orvieto General Contracting LLC SPC Fire Sprinkler Points, Fire Extinguishers & Fire Hose Reel Installation Ongoing / Recent 2026
151 Al Foah Police School – Phase 2, Al Ain Al Arabia for Safety & Security LLC / RCC Installation of Firefighting Equipment & Accessories Ongoing 2026
152 Al Ain Hospital ALPS STSR Electromechanical LLC FCU Branch Piping & Valve Package Installation Ongoing / Recent 2026
153 Tawam & Al Wagan Hospital, Al Ain Etihad International Hospitality Firefighting Bypass Pipeline Installation Ongoing / Recent 2026
154 Tawam Hospital, Al Ain Etihad International Hospitality New 8" & 10" Chilled Water Pump Installation, Valve Assembly, Testing & Insulation Ongoing / Recent 2026
155 MRI Pre-installation Works – IHLA, Abu Dhabi ALPS Star Electromechanical LLC Supply & Installation Works Related to MRI Pre-installation Ongoing / Recent 2026
156 Additional Works – Tawam Hospital, Al Ain Etihad International Hospitality SP LLC – Hard Division Hot Tapping of Chilled-Water MS/CS Pipeline, Gate Valves & Fittings, Pipe Freezing Ongoing / Recent 2026